PV Laboratory Testing Project Location: 首页 > Success Case > PV Laboratory Testing Project > This super-large project, proves our strength...

This super-large project, proves our strength...

Source: Views:

In the process of the rapid development of the photovoltaic industry, Zealwe Technology with the outstanding performance in the National Photovoltaic Equipment Quality Supervision and Inspection Center (Luoyang Quality Inspection Institute) turnkey project!

 

The success of this project is a strong witness of the strength and team spirit of technology, following ERD Laboratory, Jiaxing Tel Laboratory, Suzhou Terite Laboratory and Shanghai Noah Laboratory...

In fact, at the beginning of the project, we experienced unexpected and difficult challenges:

The whole project lasted 100 days from the end of January this year, and each task was like a race against time. One link, one ring, can tolerate no delay, we must keep efficient in every link, a little careless will lead to the whole project delay.

 

Moreover, there is a wide variety of equipment provided by many parties involved. We have to know deep into each device, make sure they work together in the system, and compatibility issues with any one device can affect the progress of the entire project. For example: only the technical data has reached 215 pages, involving 26 rooms on site. It is necessary to coordinate the commissioning of nearly 200 sets of equipment in the first and second phases.




In addition, the project involves multiple participants, changes of design scheme, adjustment of equipment parameters, refinement of construction requirements and feedback of regulatory opinions, each information is crucial, but intertwined. How to accurately screen, understand and apply key information in this complex information network has become a difficult problem we must overcome.


At the critical moment, there are more ways than difficulties. The team of quality and health technology shows the tenacious fighting spirit and excellent professional quality, specifically:


1. Positive attitude: The team remains optimistic, relieve pressure and calm deal with problems based on clear goals and trust in their own abilities.

2. Fine work: project personnel are rigorous, check and analyze data, ensure the compatibility of equipment selection and integration, solve budget problems, and reasonably arrange training reasonably.

3. Efficient collaboration: the team members are professional and diverse, with close cooperation. Technical personnel solve equipment problems with suppliers, management personnel coordinate resource progress, and training personnel to communicate with construction personnel. Information sharing and problem solving are ensured in various ways.

4. Continuous learning: The team keeps learning new technologies and ideas, optimizes the work process, and responds to new challenges.


In particular, Li Zhibin, the project leader, is cautious, down-to-earth, serious, pragmatic and efficient from beginning to end.

 

He studied every detail of the project deeply, whether it was equipment selection, construction plan, or information communication mechanism, and strictly checked it. In the face of mountains of data and data, he is always keen to find problems and propose solutions in time. His attention to detail ensures that the project can be advanced with high quality and avoids many possible problems.

 

For a few examples: for clear understanding of the project progress, we especially for the project formulated the national photovoltaic testing center table table record: the arrival of the equipment, designated location, peripheral situation, debugging progress, acceptance conditions, work log, expenses, problem summary, secondary with peripheral demand statistics, room peripheral statistics, measurement demand statistics, project all project information can be viewed in the table.



More importantly, the quality of various departments to support each other, team optimism and firm, continuous learning mentality. 

 

Team members are highly cooperative, face up to difficulties, do small things perfectly, do big things fine. Actively communicated and coordinated with the laboratory party, other equipment suppliers and the construction team, timely transmitted information, patiently listened to the opinions and suggestions of all parties, coordinated and solved the contradictions and differences, and ensured the smooth progress of the project.

Once, we encountered an emergency: we found that the field opening 100A did not meet the equipment test conditions, and checked the site CAD equipment planning map and blueprint were not consistent with the actual situation. However, it took two weeks, and the construction party still could not verify whether the omission was not. In order to speed up the overall project promotion, we took the initiative to propose and communicate with the client, and then we carried out the construction, and the client supervised and planned the drawing. The final engineering results all meet the standards of the engineering requirements and the state of customer satisfaction.




In addition, to ensure the safety and efficiency of the entire project process, we make the following strict requirements:


1、Before entering the factory, confirm the responsible person of the manufacturer, and communicate with them about the site situation, work plan and construction precautions.

2、For the personnel engaged in special operations, the certificate shall be kept to explain the construction precautions and protective measures.

3、Daily handover work schedule and next-day planned work schedule.

4、Our daily on-site communication and inspection work and details supervision.


Look from the project execution, first is not used to, even some dont understand, with the advancement of the project, the parties gradually see the results of high standard, even began to take the initiative to follow the requirements, mutual supervision and maintenance requirements, such efficient management, through the construction of each link, for the project with good quality, provides a solid discipline guarantee.




Project results and value 

The project was finally successfully completed and successfully accepted. Now, the photovoltaic laboratory of the National Photovoltaic Equipment Quality Supervision and Inspection Center (Luoyang Quality Inspection Institute) has been put into use and achieved excellent results. The photovoltaic test indicators are far beyond the expectations, with stable operation, high accuracy and good efficiency.

This fully reflects the strength of quality health technology. This case is a strong proof of the professional ability of quality and health. At the same time, it also proves that we are a professional team that can open up the road to success in many difficulties. In the future, we will move forward in the development wave of the photovoltaic industry through the waves!